Skip to content

How it looks

The actual product — not a mockup of it.

These are real Performix surfaces. Click through a few.

The result

1 / 4
Acme Engineering — Platform Group·Manager: Priya Mehta·11 members·Acme Robotics

Support is the binding constraint for the Platform Group.

Capability
4.2
Alignment
3.9
Motivation
4.1
Support
2.8starving

Support is starving primarily on two subconstructs: cross-functional response time and tooling fit. The capability and motivation evidence is strong; alignment is within normal range.

Tooling fit · Davis 1989Resource sufficiency · Hackman & Oldham 1976
Recommended Action

Convene a 45-minute working session with engineering and product to identify the top three cross-functional handoffs introducing the most delay; assign a single owner per handoff with a two-week resolution target.

Remeasure Support in 4 weeks (12 items, 8 min).

Every team gets one settled card: which condition is binding, the evidence, the single action, and when to remeasure.

Working with us directly

Some organizations engage Performix as a tool. Others engage the practice that built it — to run the diagnostic with you, interpret the result, and design the intervention. See the consulting engagement shape →